RM&R of Existing Power Supply Lines/Transformers and Provision of Power Transformers in Distt: N-Waziristan (MA)
Project Brief: Rehabilitation, Maintenance & Repair of Existing Power Supply Lines / Transformers and Provision of Power Transformers in District North Waziristan (MA) Total No [...]
RM&R of Existing Power Supply Lines / Transformers in District North Waziristan (MA)
Project Brief: Rehabilitation, Maintenance & Repair of Existing Power Supply Lines / Transformers and Provision of Power Transformers in District North Waziristan (MA) Total No [...]
RM&R of Existing Power Supply Lines / Transformers in District South Waziristan (MA)
Project Brief: Rehabilitation, Maintenance & Repair of Existing Power Supply Lines / Transformers and Provision of Power Transformers in District South Waziristan (MA) Total No [...]
Up-gradation of 66 KV Grid Station Alizai to 132 KV Kurram District (AIP)
Project Brief: Bajour:Total Feeders=10 Completed=0 U/Progress:10 Mohmand: Total Feeders=14 Completed=2 U/Progress=12 Khyber= Total feeders=15 Completed=01 U/Progress=14 Current Status (Completed or in Progress and percentage of [...]
Up-gradation of 66 KV Grid Station Kalaya to 132 KV, Orakzai Tribal District (AIP)
Project Brief: Power T/F 2*20/26MVA Major Components: Civil Works: Civil Works at grid station are 80% completed. Grid Station Equipments Tender Awarded for installation of [...]
Lawi Hydro Power Project
Project Brief: Lawi HPP of installed capacity of 69 MW is under construction on Shishi River, a left bank tributary of Chitral River by utilizing [...]
Koto Hydro Power Project
Project Brief: Project was Identified by PEDO-GTZ : 1992 Conduction of Feasibility Study: 2008-2011 (31 MW) Feasibility Study Review: 2014 (40.8 MW) Original PC-I: [...]
Jabori Hydro Power Project
Project Brief: Project was Identified by PEDO-GTZ in 1998. Feasibility Study was conducted in 2008-2011. Feasibility Review was carried out in 2013-14. EPC Contract was [...]
Chappari Charkhel Hydro Power Project
Project Brief: The PC-1 of the Project was approved by PDWP dated: 07th March, 2019. The Administrative Approval was issued by the E & P [...]
Solarization of Masajid in District Swat & 440 Masajid in Peshawar
Project Brief: The Government of Khyber Pakhtunkhwa through the Energy & Power department had started implementation of Solar Electrification of Masajid in District Swat and [...]